Overview
We prefabricated Glulam beams and CLT panels for the University of Washington Tacoma.
Project details
This project uses timber on timber as well as timber on steel. It is a great example of a build that uses a hybrid system to take advantage of each material’s strengths.
In addition to supplying mass timber for the project, we helped with refining connection detailing and sequencing logistics.
When complete, Milgard Hall will be a 55,000 square-foot hub for engineering, business and innovation.
Project Details
Completion:
Early 2023Building Type:
Square Meters:
Storeys:
Product Offered
Kalesnikoff Mass Timber
Services Provided
3D Modelling; Shop Drawings; Hardware; Mass Timber Supply