New Westminster’s new aquatics and community centre is named təməsew̓txʷ Aquatic and Community Centre, a hən̓q̓əmin̓əm̓ word for ‘sea otter house’, after an animal that conjures up images of playfulness and joyfulness. The new centre will replace the aging Canada Games Pool and Centennial Community Centre with a combined 10,684 square metre state-of-the-art facility. The new facility incorporates the important principles of accessibility, sustainability and community connection. The spaces have been designed to be flexible and accommodate a wide variety of activities that can adapt over time as community needs and priorities change. The design was driven by an extensive two-year community engagement process. This centre features exposed cross-laminated timber (CLT) roof and wall panels with exposed Glulam beams.
Kalesnikoff provided the SPF mass timber for this new community centre. The SPF Glulam beams span up to 13.9 meters. The SPF CLT is 7-ply and 9-ply. Kalesnikoff is provided the mass timber 3D modelling, shop drawings, hardware, splines, and mass timber for the facility. The need for a clear span across the 50 metre lap pool dictated a long span steel truss solution. The north facing sawtooth roof allows for natural daylight and passive ventilation into the pool, with the sawtooth profile created by spanning CLT panels between the steel truss chords. The architectural vision for a seamless CLT soffit was realized by hanging the CLT panels from the truss bottom chord, resulting in design that integrated structure, architecture, and sustainability.
The facility, designed for a LEED Gold green building certification, will be the first aquatic centre to achieve the Canadian Green Building Council Zero Carbon Building certification, aiming for a 90% reduction in GHG emissions and eliminating fossil fuel emissions completely.
Project Details
Completion:
2022Building Type:
CommercialSquare Meters:
10684Storeys:
2Product Offered
Mass Timber, Cross-laminated Timber (CLT), Glue-laminated Timber (GLT or glulam)
Services Provided
mass timber supplier, 3D modeling, shop drawings, hardware, splines
Owner
City of New Westminster
General Contractor / Construction Manager
Architect
HCMA
Engineers
Fast + Epp
Additional Partners
Certifications
LEED Gold, Canadian Green Building Council Zero Carbon Building