Overview
A total of 70+ truckloads of mass timber (2,100 m3) will be required for this commercial office building in Utah.
Project details
With so many truckloads needed, effective logistics coordination is paramount. Our team divided the loads into two zones and is preinstalling most of the beam hangers to hasten the on-site installation process.
We also spearheaded the clash detection and MEP integration processes and proposed solutions to facilitate a more efficient installation.
Product
DFL Glulam and CLT
Services
3D Modelling, Shop Drawings, Value Engineering, Lifting Engineering
Engineer
Completion
2024